91精品国产色综合久久不卡蜜,999国内精品永久免费视频试看,五月婷婷六月香,欧美成人综合在线,日韩亚洲第一页,国产欧美日韩不卡在线播放在线

Scan code consultation:
0755-2102 2109
Technology
Technology
Current location: Home Technology Ex tech
How is explosion-proof testing conducted

SINO Testing Services

| 2020-12-23|Return

Explosion proof certification is the process of determining whether equipment meets the requirements of explosion-proof standards, conducting type tests and routine tests for adaptation, and issuing relevant certificates of conformity. The certificate can be for Ex devices or Ex components.

Domestic institutions



NEPSI - National Explosion proof Safety Supervision and Testing Station for Instruments and Meters

Inspection Guide


Explosion proof electrical product manufacturers should follow the following procedures when applying for explosion-proof certificates and test reports, and provide materials and prototypes.
Submission of inspection materials
1. Enterprise Qualification Certificate
Copy of the business license of the enterprise (at the time of initial inspection), introduction letter/power of attorney/application letter from the unit.
2. Enterprise Quality Assurance Certificate
According to GB3836.1-2010, enterprises should provide corresponding quality assurance certificates when submitting for review. When a company passes the ISO9000 series certification, providing a copy of the ISO9000 series certification is sufficient.
3. Technical data
The technical materials submitted by enterprises for review include enterprise standards or technical requirements, product drawings, user manuals, etc. All technical documents should be in duplicate.
a) Enterprise standards/technical requirements
The enterprise standards/technical requirements of the product should be written in the prescribed format, which should include not only the performance requirements of the product, but also relevant content related to explosion protection, such as basic parameters, explosion protection signs, environmental conditions for use, explosion protection performance requirements, relevant tests of explosion protection performance, and signs related to explosion protection.
b) Product drawings
When applying for an explosion-proof certificate for intrinsically safe electrical equipment, enterprises should provide assembly drawings, circuit schematics, printed circuit board diagrams, screen printing diagrams, component material lists, and nameplate diagrams. When enterprises move towardsZhongnuo TestingWhen applying for an explosion-proof certificate for non intrinsic safety electrical equipment, the technical data submitted for inspection should include drawings that can reflect the explosion-proof performance of the sample (including assembly drawings and part drawings). When the overall drawing can clearly indicate the explosion-proof parameters and structure of the product, only the overall drawing can be submitted for inspection.
The user manual should include basic parameters, explosion-proof markings, product outline drawings, installation, maintenance, ordering instructions, and clearly indicate to the user the precautions to ensure the explosion-proof performance of the product during installation and use.
d) Other information
For products with adhesives and sealants, the corresponding adhesive and sealant model names, performance specifications, and relevant process documents should be provided. For products with plastic shells, the material and corresponding performance documents of the plastic should be provided.
4. Sample submission for explosion-proof certificate application
The prototype submitted by the enterprise for inspection should be consistent with the approved drawings and fully assembled, and the number of inspection units should meet the requirements. If there are special disassembly tools, they should be sent together. For sealed electrical equipment, one set of products with intact sealing and one set of products without sealing should be sent. Observation windowZhongnuo TestingAn additional 5 transparent pieces should be sent, at least 3 pieces. An additional 8 pieces, at least 5 pieces, of transparent components for the lighting fixtures should be provided. The rubber aging test should provide 3-5 35 × 15 × 6 rubber blocks. Two plastic sheets with a diameter of 150 × 60 are required for measuring the insulation resistance of plastic shells. If the size allows, the plastic casing can be directly measured.
5. Application method:
5.1 Free application: The submitting unit shall apply on its own, prepare relevant materials, assist in debugging the prototype, and modify non-standard parts of the materials on its own, with a relatively long cycle and high comprehensive costs.
5.2 Proxy Application: Proxy application refers to the entire process of proxy application conducted by a professional explosion-proof electrical technology service organization. The intermediate data modification, prototype debugging, and progress coordination are entrusted to the proxy organization * to complete according to authorization, with good progress guarantee, and the signing of a proxy agreement in the middleZhongnuo TestingYou can get the certificate in about 30 days, but the downside is that you need to pay some agency fees.
Regarding the time for evidence collection:
The drawings and samples are complete and meet the standard requirements. There are no special or complex tests, and it usually takes one month.
Explanation of Evidence Collection Fees
Based on the explosion-proof mark of the product, the complexity and size of the product, the presence or absence of complex testing items, and consideration of representative models. Generally around 10000 yuan, representing an additional 10% for each model. For large-scale complete sets of products, series of products, and center charging standards that are not listed, they shall be executed in accordance with the Contract Review Procedure and determined through negotiation.  
change
If there are errors in the content of the explosion-proof certificate, it should be changed in a timely manner. For changes in the unit address and the original manufacturing unit name, the change procedures and application letter should be presented for the change.
Renewal of certificate upon expiration

When the expiration date of an enterprise's explosion-proof certificate is approaching, the enterprise should provide an application letter for certificate renewal within three months before and after the expiration date, and should bring the following information to apply for certificate renewal again. If there are any unexpected situations, please notify our center in a timely manner. The application letter includes the product name, model, original explosion-proof level, original explosion-proof certificate number, and an explanation of whether the product has been changed. The enterprise should also send the expired explosion-proof certificate and the technical data that have been sent for inspection to the center for re examination, and provide samples for re inspection.


Related Recommendations
Contact us
0755-2102 2109
Add: 13F, Building C, Kangjia Guangming Technology Center, No. 288 Xingxin Road, Guangming District, Shenzhen
Follow us
Copyright: Shenzhen Zhongnuo Testing Technology Co., Ltd. 粵ICP備18004888號
Service Hotline
18924609560
點擊這里給我發消息 1354407946
點擊這里給我發消息 1354407946
亚洲 国产精品 日韩| 国产网站麻豆精品视频| 色综合久久天天综合观看| 成人高清视频免费观看| 亚洲精品久久玖玖玖玖| 国产成人欧美一区二区三区的| 四虎论坛| 欧美1卡一卡二卡三新区| 欧美一区二区三区性| 久久99欧美| 日韩免费在线观看视频| 青草国产在线| 免费毛片基地| 日韩中文字幕在线观看视频| 亚洲精品中文字幕久久久久久| 欧美日本二区| 欧美a免费| 精品国产三级a| 国产精品免费久久| 日本特黄特黄aaaaa大片| 日韩免费在线观看视频| 可以在线看黄的网站| 麻豆系列 在线视频| 精品久久久久久影院免费| 韩国三级视频网站| 久久久久久久网| 九九久久99综合一区二区| 日本在线不卡视频| 国产一区二区精品久久91| 亚洲 男人 天堂| 中文字幕97| 一级女性大黄生活片免费| 欧美激情一区二区三区在线播放| 色综合久久天天综合观看| 青青久久网| 欧美国产日韩久久久| 精品视频在线观看一区二区 | 黄色福利| 一级女人毛片人一女人| 精品国产一区二区三区久| 国产网站在线| 国产伦精品一区二区三区在线观看| 欧美一级视频免费| 国产一区二区精品在线观看| 精品国产亚洲一区二区三区| 国产网站免费在线观看| 高清一级做a爱过程不卡视频| 天天色成人| 国产激情一区二区三区| 精品久久久久久综合网| 久草免费在线视频| 欧美另类videosbestsex高清| 九九精品在线播放| 精品视频在线观看免费| 一级女性全黄久久生活片| 国产a网| 亚久久伊人精品青青草原2020| 九九免费高清在线观看视频| 九九久久99综合一区二区| 999久久狠狠免费精品| 九九精品在线播放| 国产成a人片在线观看视频| 欧美1卡一卡二卡三新区| 亚洲第一页乱| 国产伦精品一区三区视频| 欧美α片无限看在线观看免费| 国产亚洲精品aaa大片| 精品在线观看国产| 韩国三级一区| 香蕉视频久久| 成人免费一级毛片在线播放视频| 久久久久久久久综合影视网| 九九热国产视频| 91麻豆精品国产自产在线观看一区| 91麻豆精品国产自产在线观看一区| 欧美国产日韩在线| 久久久久久久免费视频| 青青久久国产成人免费网站| 国产成人啪精品视频免费软件| 成人高清免费| 你懂的国产精品| 黄视频网站在线免费观看| 久久精品欧美一区二区| 精品国产一区二区三区久 | 日本久久久久久久 97久久精品一区二区三区 狠狠色噜噜狠狠狠狠97 日日干综合 五月天婷婷在线观看高清 九色福利视频 | 九九精品在线播放| 精品国产亚洲一区二区三区| 99久久网站| 国产伦精品一区三区视频| 天天做日日爱夜夜爽| 国产伦理精品| 日韩在线观看视频网站| 高清一级做a爱过程不卡视频| 91麻豆国产级在线| 日韩一级精品视频在线观看| 麻豆网站在线免费观看| 中文字幕97| 九九久久国产精品| 欧美大片一区| 九九久久国产精品| 欧美激情在线精品video| 久久99欧美| 日本在线www| 久久精品欧美一区二区| 日韩一级精品视频在线观看| 国产激情视频在线观看| 青青久久国产成人免费网站| 精品在线视频播放| 精品美女| 免费国产一级特黄aa大片在线| 美女免费毛片| 成人在免费观看视频国产| 成人免费观看视频| 九九精品在线播放| 日本免费区| 欧美另类videosbestsex高清| 欧美激情一区二区三区在线| 久久国产精品永久免费网站| 国产一区精品| 欧美激情一区二区三区在线| 青青久久精品| 免费的黄视频| 日本免费区| 日本久久久久久久 97久久精品一区二区三区 狠狠色噜噜狠狠狠狠97 日日干综合 五月天婷婷在线观看高清 九色福利视频 | 国产成人女人在线视频观看 | 国产一区二区精品久久91| 美女免费精品高清毛片在线视| 日本在线不卡视频| 久久久成人影院| 韩国毛片 免费| 九九免费高清在线观看视频| 你懂的在线观看视频| 免费国产一级特黄aa大片在线| 精品久久久久久中文字幕一区 | 久久久久久久网| 日韩中文字幕在线观看视频| 深夜做爰性大片中文| 国产亚洲精品aaa大片| 成人在免费观看视频国产| 天天色成人| 成人a大片高清在线观看| 日韩中文字幕在线观看视频| 四虎影视库| 久久久久久久网| 免费的黄视频| 欧美激情一区二区三区在线播放| 四虎影视精品永久免费网站| 欧美a级片视频| 国产一级强片在线观看| 国产精品123| 国产不卡福利| 亚洲爆爽| 毛片电影网| 99热精品一区| 日韩av东京社区男人的天堂| 天天色成人| 可以免费看毛片的网站| 精品视频一区二区三区| 美女免费毛片| 欧美大片一区| 天天做日日爱| 四虎影视库国产精品一区| 国产成人精品影视| 日本久久久久久久 97久久精品一区二区三区 狠狠色噜噜狠狠狠狠97 日日干综合 五月天婷婷在线观看高清 九色福利视频 | 日韩中文字幕一区二区不卡| 国产不卡在线播放| 深夜做爰性大片中文| 国产一区二区精品在线观看| 日本免费乱理伦片在线观看2018| 91麻豆tv| 国产91精品一区| 久久国产一区二区| 色综合久久天天综合观看| 黄色福利片| 国产91精品露脸国语对白| 高清一级片| 精品国产一区二区三区久久久狼| 久久国产精品只做精品| 成人免费观看视频| 午夜精品国产自在现线拍| 久久精品欧美一区二区| 成人a级高清视频在线观看| 精品视频在线看| 久久国产精品永久免费网站| a级毛片免费观看网站| 国产不卡在线播放| 久久精品人人做人人爽97| 国产一区二区精品久久91| 久久福利影视| 国产不卡福利| 青青久在线视频| 久久精品道一区二区三区| 精品视频在线看| 欧美日本二区| 日日日夜夜操| 色综合久久天天综合观看| 欧美激情一区二区三区中文字幕| 国产一区二区精品久久91| 国产一区二区精品久久91| 国产一区二区精品久久91|